This week I put some time into organizing all of the work I’ve been doing over the last few weeks. There is a lot of important upkeep I still need to do, and I’m hoping to get everything onto source control to make future collaboration easier. One thing that came up last week, was a small issue with the mounted drive for the cluster. Despite being a minor problem, it still took multiple hours to debug and fix properly.
For next week I am planning on connecting the cluster to a domain that I bought, and making a simple landing page to check that the domain connects to whatever I’m hosting. At this point I feel like I’m over the hump for this stage of development, and waiting to begin work on everything else.
$title =
Capstone – Week 5
;
$content = [
];
$date =
;
$author =
;
$previous =
;
$next =
;